Independent
completion expertise.
Delivered with accountability.
We give owners and boards independent, evidence-based assurance that complex projects finish as verified, not as reported.
Proofdatum is a specialist completion management advisory for complex capital projects.
We connect system-based verification, Mechanical Completion governance, documentation integrity and commissioning readiness, so facilities are delivered safe, reliable and ready for operation.
Why Proofdatum exists
Close the readiness gap
Progress can mask gaps in system boundaries, completion evidence and punch exposure. We surface them before handover.
Independent perspective
We provide objective completion governance that makes readiness measurable, traceable and accountable.
Focus on delivery assurance
Our mission is to make handover risk visible, evidenced and decidable before it costs schedule or project value.

Founder-led. Field-proven.
Proofdatum is led by its founder, Bernardo Silva, a chartered mechanical engineer who has spent over twenty years on the completion side of complex offshore projects: FPSOs, platforms, subsea systems and pipelines across Europe, Africa and Asia, in delivery roles with TotalEnergies, BP, Tullow Oil and Premier Oil.
That time was spent where handover actually happens: walking systems with construction and commissioning teams, closing out more than forty thousand inspections and tests across hundreds of subsystems on a single development alone, working down punch lists that ran to more than fifty thousand items, and taking two converted FPSOs to sail-away with mechanical completion and pre-commissioning brought to documented closure. Along the way he learned what the textbooks leave out: how readiness quietly slips, how good teams end up defending dates they no longer quite believe, and how much of it is recoverable when someone looks at the evidence early enough.
He founded Proofdatum to put that experience at the service of project leaders: quietly, inside your team and your systems, on your side of the table. If your project is approaching a handover it cannot afford to miss, he would welcome the conversation.
Bernardo Silva · Founder & Managing Director · Chartered Mechanical Engineer
Connect on LinkedIn
- 20+ years' experience
Mechanical Completion, commissioning readiness and system-based handover.
- Direct project delivery
FPSO, subsea, offshore, EPC and oil & gas facility environments.
- Advisory differentiation
Practical governance models for measurable completion assurance.
- Why it matters
We understand the real interface between construction, systems completion, commissioning, documentation and project controls.
Our operating model
Independent governance
Impartial oversight across system boundaries, completion evidence, punch exposure and readiness risk.
A proprietary framework connecting system hierarchy, verification, documentation integrity, schedule alignment and executive governance.
Practical delivery control
Designed for live project environments where multiple interfaces must be aligned under schedule pressure.
Physical System Control
Completion Verification
Documentation Integrity
Schedule Integration
Executive Governance
What differentiates Proofdatum
Independent completion governance
Objective oversight focused on readiness risk, not internal progress optimism.
System-based delivery control
Completion status structured around systems, subsystems, boundaries, Inspection and Test Records (ITRs), certificates, punch exposure and handover readiness.
PCMS-agnostic integration
We work across ICAPS, PIMS, ProCoSys, WinPCS, Excel-based registers and client-specific tools.
Evidence-driven readiness
Progress is assessed against verified completion evidence, dossier integrity, punch status and commissioning acceptance criteria.
Schedule-to-completion alignment
Construction progress, MC skyline, commissioning sequence and readiness constraints are reconciled into a single delivery view.
Experience rooted in oil & gas, applicable across complex facilities
Proofdatum’s experience is rooted in oil and gas, FPSO, subsea, offshore, EPC and facility delivery environments.
The same completion principles apply wherever piping, electrical, instrumentation, HVAC, mechanical equipment, documentation, testing and system handover must be verified before safe operation.
FPSO & offshore facilities
Mechanical completion, pre-commissioning and commissioning readiness across hull, living quarters, topsides, turret systems and utilities, through to systems handover.
Subsea & marine interfaces
Installation, pre-commissioning and commissioning verification across SURF and SPS scopes: umbilicals, risers, flowlines, structures, hardware and tie-in systems, through to topsides integration.
Platforms & topsides
Piping, E&I, mechanical, HVAC, safety systems, utilities and operational readiness across complex facility scopes.
Transferable facility systems
Standards-aligned, evidence-led governance
We align our governance practice with these frameworks; we do not claim certification against them.
API RP 1FSC
Subsystem definition, completion boundaries and handover certification staged to systems-completion practice.
ISO 21502
Completion governance embedded in the project’s delivery organisation, with defined roles and decision points.
ISO 21505
Escalation routes, hold points and sign-off authority set so completion decisions are made at the right level.
ISO 31000
Completion risk identified by subsystem, escalated on evidence and tracked to closure.
ISO 9001
Inspection, test and punch records treated as quality evidence, not paperwork.
ISO 15489
Dossier and certificate control that keeps evidence traceable from tag to handover.
Ready to strengthen handover readiness?
Proofdatum helps owners and EPC teams improve completion control, evidence integrity and schedule-readiness alignment before late-stage risk escalates.