Independent control across the handover gap

Proofdatum helps capital projects move from construction progress to verified mechanical completion and commissioning readiness through evidence-led completion governance.
Built on the CompleCore™ operating framework

capability positioning

Proofdatum provides independent completion governance for complex capital projects, linking field execution, evidence-based verification and schedule-readiness control to improve handover certainty.

Core capability areas

Proofdatum integrates field execution, systems control and governance intervention to improve readiness across critical handover stages.

Completion technician verifying a valve during subsystem walkdown on an offshore process module

Execution & Oversight

Field-led completion control across subsystem readiness, mechanical completion and turnover sequencing.

Project office reviewing an integrated completions dashboard

Systems & Integration

PCMS-agnostic integration linking completion evidence, subsystem status and schedule-readiness visibility.

Senior review meeting discussing completion governance, escalation and risk

Governance & Assurance

Independent governance and executive-level intervention during high-risk handover and recovery phases.

Project team reviewing a PCMS health-check dashboard

PCMS Integration

Independent assessment, integration and optimisation of Project Completion Management Systems.

Product names are trademarks of their respective owners; no affiliation or endorsement is implied.

A proprietary framework connecting system hierarchy, verification, documentation integrity, schedule alignment and executive governance.

Where these capabilities are applied

Project phases

00

FEED & Detailed Engineering

Completion readiness designed in: tag registers, ITR allocation and inspection plans

01

Construction Completion

Discipline and area work completed across workfronts

02

Mechanical Completion

Installed work inspected, tested and proven as subsystems completed

03

Pre-Commissioning

Subsystems cleaned, conditioned and statically proven safe to commission

04

Commissioning

Systems energised, tested and proven ready for start-up

READY FORStart-Up & Operations

Gate names and positions vary by operator and delivery model. The control principle does not: verified completion and controlled punch at every handover, from construction through to operations. Independent assurance adds most value when it starts early: designed in during FEED and detailed engineering, and carried through every gate from construction to operations.

Delivery environments

Offshore FPSOs & platforms
Subsea developments
LNG & gas
Renewables & infrastructure

How we engage

Delivery outcomes

Verified delivery against handover milestones

System-based turnover control aligned with the commissioning sequence.

Reduced disruption and rework exposure

Punch dependencies controlled early, before they cascade into late-stage delay.

Stronger evidential position

Documented completion governance supported by traceable, defensible audit evidence.

We work inside your existing team, tools and completion system; we do not replace them.

Ready to strengthen handover readiness?

Proofdatum helps owners and EPC teams improve completion control, evidence integrity and schedule-readiness alignment before late-stage risk escalates.